Studi Perbandingan Biaya Bahan Pada Bekisting Kayu dan Bondek Pada Museum MPU Purwa Kota Malang
Abstract
Kata kunci : bekisting kayu, bondek, biaya pekerjaan.
ABSTRACT
Establish a building taking into account all aspects of kostruksi is the main items needed in the world of construction, which cost aspects of the construction itself is commonly referred to as The Plan Cost Budget and following the reference of the basis of the regulation of the Minister of public works Housing (PERMEN PUPR) is the Laws – the invitation in Indonesia that are assigned by the President to the Minister related to run the rules properly. The results of the analysis of unit price is taken from the PermenPUPR 28 – 2016 from the analysis results will be retrieved The Plan Cost Budget that determine the volume of each of the items that will be discussed on the discussion. [1]. The objects of research are currently located in Jln. Soekarno – Hatta at the Museum of the MPU Purwa Malang. Unit price analysis and cost budget Plan (RAB) focused on the work of bekisiting wood, gave results will be examined or compared with the results of the analysis of bondek, in other words the results of analysis of formwork timber will be a reference analysis on bondek. The results showed that: (1) cheaper bondek plate Materials 9% of timber formwork materials, (2) Plate bondek easier in implementation, (3) Material for formwork timber jobs more easily obtained than with the bondek plate. Based on these three aspects, for the selection of particular work plates are recommended to use the plates bondek.
Keywords
Full Text:
PDFReferences
Bekesting Precast Menggunakan Plat Baja. 2015. (http://www.knowlangecenter.pttp.co.id/web/post/article/bekesting-precast menggunakan-pelat-baja).
Candra Yuliana, 2011, Perbandingan Penggunaan Deking Baja Dan Metode Konvensional Untuk Plat Lantai Diperhitungkan Terhadap Biaya, Waktu Dan Metode Pelaksanaan. Jurnal. Unlam Banjarmasin.
I.A. Rai Widhiawati, A. A. G. A. Yana, dan A.A. Asmara. Analisa Biaya Pelaksanaan Antara Pelat Konvensional Dan Sistem Pelat Menggunakan Metal Deck. Jurnal. FTUU. Denpasar.
Mardal Muhammad, 2008, Optimalisasi Waktu dan Pekerjaan Bekesting Untuk Gedung Bertingkat Dengan Sistem Zoning. Skripsi. FTUD. Depok.
Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat. 2016. Tentang Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum. Jakarta Selatan.
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 Yehezkhiel Daghu, Andy Kristafi Arifianto

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
eUREKA : Jurnal Penelitian Teknik Sipil dan Teknik Kimia
Email : [email protected]
Editorial Office :
Fakultas Teknik, Universitas Tribhuwana Tunggadewi Malang
Jl. Telaga Warna Blok C, Tlogomas, MALANG 65144, Jawa Timur
Tel / fax : (0341) 565 500 / (0341) 565 522
![]() This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License |
![]() |