KAJIAN METODE PELAKSANAAN DAN PERBANDINGAN KOEFISIEN UPAH KERJA PADA PEKERJAAN PEMASANGAN BATA RINGAN Studi Kasus: Pembangunan Gereja Kristen Indonesia Bromo Kota Malang

REYNOLD JOHAN ALEKSANDER TELNONI, Nawir Rasidi, Suhudi Suhudi

Abstract


In a construction project either in the planning, implementation and supervision of construction management indispensable good. It is intended that a project can run well, with cost-efficient and can be implemented on time. The method of implementation is an important part in the implementation of a project. What is important is the coefficient of wages as this will greatly affect the welfare of the workers. The determination of the coefficient of wages must be referring to the Indonesian National Standard (SNI). Light brick is a material that is widely used today. However, SNI has not been set on the coefficient of light brick work itself so that the implementation of the field is still used coefficient of wages for work of red brick. Calculating the coefficient of wages is by dividing the daily work volume and number of employees as a factor denominator. From observations made on the installation work light brick building Gereja Kristen Indonesia Bromo, the method used is correct. From the analysis of the data for wage coefficients obtained total wage employment lightweight brick installation methods SNI Rp 76.12 million, while total wages fact the field installation of light brick Rp 63.106 million, and based on research wages brick work lighter by Rp78.955 million, For the cost/m2 installation of lightweight brick according to SNI is Rp 29909.88. While the value of wage employment per m2 installation of lightweight brick according to the reality on the ground is Rp 24797.08 difference between the two comparisons is Rp 5112.8. Cost saving light brick work execution reached 17%.

Kata Kunci : Bata ringan, Metode pelaksanaan, Koefisien upah kerja

Full Text:

PDF

References


Anonim. 2008. SNI 6897. Tata cara perhitungan harga satuan pekerjaan dinding untuk konstruksi bangunan gedung dan perumahan. Jakarta : Badan Standar Nasional.

Bachtiar Ibrahim. 2001. Rencana Dan Estimate Real Of Cost, Bumi Askara. Jakarta.

Badan Standarnisasi Nasional Indonesia. 2016. Kumpulan Analisa Biaya Konstruksi Bangunan Gedung dan Perumahan. Jakarta.

Dinas Pekerjaan Umum. 2015. Analisa Harga Satuan. Malang: Pemerintah Kabupaten Malang.

Dipohusodo, Istimawan. 1996 Manajemen Proyek dan Konstruksi Jilit 1 dan 2, Kanisius.

Hajek, Victor G. 1988. Manajemen Proyek Perekayasaan Edisi Ketiga, Penerbit Erlangga, Jakarta.

http://www.ilmusipil.com/tenaga-kerja-proyek-bangunan. (t.thn.).

Mukomoko J. A.1994. Dasar Penyusunan Anggaran Biaya Bangunan. Gayu Media Pratama. Jakarta.

Soemanto, M. A. 2014. Perhitungan Harga Satuan Pekerjaan Dinding Bata Ringan Dengan Metode SNI & MS. Project Pada Proyek Pembangunan Gedung Laboratorium Enterpreneurship Terpadu Universitas Brawijaya Malang . Malang: Universitas Brawijaya Malang.

Soeharto Iman. 1992. Manajemen Proyek dari Industri, Erlangga. Jakarta.

Sumardjito, M. (t.thn.). Pokok-Pokok Materi Mata Kuliah Manajemen Konstruksi. Yogyakarta: Jurusan Pendidikan Teknik SIpil & Perencanaan Fakultas Teknik UNY.

Tarore, D. I. (2010). Manajemen Konstruksi. Jakarta: Gapeksindo.

Umum, P. M. (2007). Pedoman Teknis Pembangunan Bangunan Gedung Negara. Jakarta: Menteri Pekerjaan Umum Republik Indonesia.

Zakaria, Zainal Abidin. 1923. Analisa Bangunan. Jakarta : Gramedia


Refbacks

  • There are currently no refbacks.


Copyright (c) 2018 eUREKA



eUREKA : Jurnal Penelitian Teknik Sipil dan Teknik Kimia

ISSN 2548-771X (online)

Email : [email protected]

 

Editorial Office :
Fakultas Teknik, Universitas Tribhuwana Tunggadewi Malang

Jl. Telaga Warna Blok C, Tlogomas, MALANG 65144, Jawa Timur
Tel / fax : (0341) 565 500 / (0341) 565 522

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License

 

View My Stats